NEW TURF FIELD COMING 2023

NEW TURF FIELD COMING TO ALL SAINTS 2023

TOGETHER we are 

UNITED in 

RECONNECTING our 

FAMILY

The new facility will benefit our players, coaches and families.

It’s happening!  As many of you know, we are finalizing the plan for the turf project at All Saints. This project will allow us to use All Saints as the base for ALL THINGS INTER CT. We will be able to achieve our goal of bringing our community together in one location and build a stronger and more successful soccer family. No more long journeys for practices and games. No longer will parents have to divide and conquer for their kids to get to alternate training locations!!!!!!

You can find the press release here: https://www.interctfc.com/news_article/show/1248803

After a successful phase one of fundraising, we were able to do the following:

  • Land survey plans
  • Concept drawings
  • Soil analysis
  • Soil Pits for engineering
  • Brush removal

We are now into phase 2 to help us complete the project by September 2023. - See below for how you can help in phase 2

How you can donate today:

Give a Tax-Deductible Gift Online ( confirm with your Tax advisor ) 
https://football4all.net/welcome/ 
All donations may be tax deductible and you will receive a receipt for your records.

Corporate Matching Gift Programs
Check with your company to see if a matching program exists.  This is a great way to double the impact of your donation.

Stock Donations
When you make a gift of stock, you may avoid paying the capital gains tax on any increase in the current value over the original cost of the stock.  You’ll also get a tax deduction for the full fair market value of the stock at the time of transfer.  It’s a win-win!

THE PLAN

These concept images from Field Turf show the scope of what we can achieve. 

One showcase 11v11 Field with a 9v9 field to the side.

Inter CT will have 11v11, 9v9 and 7v7 Turf field options.

Phase 2 - The first Half

In this phase, having raised enough money in phase one for site surveys, engineering plans, initial site clearance and plans, we are looking for major contributions to help pay for the deposit of the project.

PHASE 1 - "The warm up"

In this phase, we need to raise $160K for initial engineering works, site plans and planning. This initial phase also covers separate entrance work for trucks to enter the All Saints school.

Full $160K raised - Including $100K from Inter CT